1. Design principles
-1 Fully utilize existing facilities and pipelines to reduce investment scale and costs;
-2 After treatment, purified water can be considered for recycling, reducing treatment load, reducing operating costs, improving economic benefits, and saving water;
-3 The newly built sewage treatment system is easy to operate and has low operating costs;
-4 When adding and renovating new treatment system and equipment, pipelines, try to maintain the original landscape as much as possible without damaging the aesthetic effect of the area;
2. Process Description
After the sewage is collected by the drainage system, it enters the grid well of the sewage treatment station. After the removal of particles and sundries, it enters the reaction tank for dosing reaction. The reacted sewage enters the secondary reaction tank, and then enters the screw folding machine for solid-liquid separation. The clean water flows into the primary cleaning tank, and is further filtered by the filter press. The clean water enters the clean water tank, and is pumped into the quartz sand filter tank and the activated carbon filter tank by the self-priming pump. The effluent can be discharged or recycled.
Regularly clean the debris left by the grille and the sludge from the plate and frame filter press.
3. Main Parameter:
No. | Item | Parameter |
1 | Machine size | Host unit 3400*1450*1900mm(L*W*H) Clear tank:2200*1000*1700mm (L*W*H) |
2 | Medicine type | 复合型mixed mode |
3 | Medicine | 聚合氯化铝polyaluminum chloride 聚丙烯酰胺polyacrylamide |
4 | According to the different concentrations of wastewater, the medicine dosage around: 2~6kgs / T | |
5 | Power | 1.5.0kw 3P 50Hz |
6 | Processing capacity | 1T/2T/3T/4T/5T / day |
7 | Weight of machine self | Around 1500kgs |
8 | Wearing part | filter cloth=10pcs/ pair (it can be washed with high pressure water gun when there is too much waste) |
9 | Waste Disposal | The discharged solid waste can be buried in designated areas |
10 | Warranty | 1 years |
11 | Delivery time | After receive payment 25days |

Flexo Water Ink Wastewater Treatment Machine

1. Design principles
-1 Fully utilize existing facilities and pipelines to reduce investment scale and costs;
-2 After treatment, purified water can be considered for recycling, reducing treatment load, reducing operating costs, improving economic benefits, and saving water;
-3 The newly built sewage treatment system is easy to operate and has low operating costs;
-4 When adding and renovating new treatment system and equipment, pipelines, try to maintain the original landscape as much as possible without damaging the aesthetic effect of the area;
2. Process Description
After the sewage is collected by the drainage system, it enters the grid well of the sewage treatment station. After the removal of particles and sundries, it enters the reaction tank for dosing reaction. The reacted sewage enters the secondary reaction tank, and then enters the screw folding machine for solid-liquid separation. The clean water flows into the primary cleaning tank, and is further filtered by the filter press. The clean water enters the clean water tank, and is pumped into the quartz sand filter tank and the activated carbon filter tank by the self-priming pump. The effluent can be discharged or recycled.
Regularly clean the debris left by the grille and the sludge from the plate and frame filter press.
3. Main Parameter:
No. | Item | Parameter |
1 | Machine size | Host unit 3400*1450*1900mm(L*W*H) Clear tank:2200*1000*1700mm (L*W*H) |
2 | Medicine type | 复合型mixed mode |
3 | Medicine | 聚合氯化铝polyaluminum chloride 聚丙烯酰胺polyacrylamide |
4 | According to the different concentrations of wastewater, the medicine dosage around: 2~6kgs / T | |
5 | Power | 1.5.0kw 3P 50Hz |
6 | Processing capacity | 1T/2T/3T/4T/5T / day |
7 | Weight of machine self | Around 1500kgs |
8 | Wearing part | filter cloth=10pcs/ pair (it can be washed with high pressure water gun when there is too much waste) |
9 | Waste Disposal | The discharged solid waste can be buried in designated areas |
10 | Warranty | 1 years |
11 | Delivery time | After receive payment 25days |